Calendar of Events Facilities - Bob Brown Expo Hall - Carl Bell Convention Hall - Concert Hall - Exhibition Hall - Mary Jane Teall Theater - Meeting Rooms Ordering Services - Air Water Gas - Electrical Services - Internet Services - Sign Hanging - Special Services - Telephone Services Parking & Directions - Directions - Parking - Transportation Visiting Wichita - Attractions - Lodging - Restaurants
All connection to building equipment must be done by staff electricians only!
Wall, pole, and floor outlets are not part of the booth space. Separate outlets MUST be ordered for each booth to be connected. ALL material and equipment furnished remains property of the Century II Convention Center.
Rates include any necessary city permits, inspections, tax, or normal wear.
Rates include bringing circuits to the rear of the exhibit booth, or one side of an island booth. A single plug-in is supplied per circuit ordered. Distribution of power in the booth, extension cords, and power strips, are the responsibility of the exhibitor.
Additional cords and power strips may be rented from our service counter. The exhibitor’s own cords should be inspected for wear and be U.L. Approved. Lightweight or ungrounded extension cords are not allowed.
We are not responsible for voltage fluctuations or power failures on service lines.
We reserve the right to refuse to make any connections which violate city or national electric codes.
The most common power request is for 20 AMP 110 volt. This is sometimes called household power or standard current. A normal room in your home can use this amount of power. You could run up to 18-100watt light bulbs off a single 20 AMP circuit.
Remember, heating elements and some appliances can draw as many as 11 AMPs each. Look for an electrical label or call if you are not sure about your equipment’s requirements.
To receive advanced rate, the payment and order form must be received in our office 5 working days prior to the published move-in date of your event.
Utilities Order Form (PDF)